High energy cost
Compare documented electrical inputs, operating hours and delivered air under the same service conditions. Keep tariffs, auxiliary energy and maintenance visible.
New projects stay in memory until you choose Save or Export. Local saving is not a cloud account. Contacts are excluded from saved project files.
- Which billing period, currency, tariff schedule and baseline cost are being compared?
- What package electrical power is measured in each operating state, and how was it measured?
- What mutually exclusive running, unloaded, standby and stopped hours apply?
- What supplied flow, reference conditions, use-point pressure and quality were delivered?
- Which dryers, cooling devices and other auxiliaries are already included in the meter total?
- What load-profile, leak, maintenance, price and investment records support a proposed change?
- Motor shaft power is not package electrical input, and known electrical input must not be divided by motor efficiency again.
- Variable speed, a larger machine or leak repair does not guarantee a fixed percentage saving.